Logerhead Turtles Are Facing New Threats On Our Beaches
The goal for SETO’s CSP research is to achieve $0.05/kWh for dispatchable CSP with >12 hours of thermal energy storage (TES), with a 50% thermal-to-electric power cycle efficiency at a turbine inlet.
Sea turtles: Threats | Turtle Foundation
